Forward-deployed AI engineering

Your AI pilot worked. It still isn't in production.

We put engineers inside your team and your systems, pick one workflow with a number attached, and take it all the way to production — measured against a baseline you agreed before we started.

Why we exist

Most enterprise AI never leaves the demo. The gap is almost never the model — it's the method: the data access, the permissions, the evaluation harness, the fallback when it's wrong, and the team that has to run it on a Tuesday.

Nobody owns that work, so it doesn't get done, and a capable pilot quietly becomes a line item. It can't be delivered from a deck either, because it is specific to your stack. It has to be built next to the people who will inherit it. That is the whole reason this firm exists.

One pattern worth knowing: programmes rarely fail during the build. They fail earlier, in the stretch where nobody managed to turn an ambition into a scoped, measurable use case. That is where we spend our first weeks, and it is why some of them end with us telling you not to build.

What we build

The work, concretely

These are the shapes of problem we take on. Each one is a workflow a team already performs by hand, at volume, where the cost of doing it is visible in a system you already own.

Intake triage & routing

High-volume inbound work arriving through several front doors with no consistent classification. Agents classify on arrival, attach the missing context, and propose a route for one-click confirmation.

Moves · misroute rate, time to correct assignment

Duplicate consolidation

During an incident the same issue is reported dozens of times and linked by hand. Agents match each arrival against open work on both meaning and structure, propose a parent, and catch the late stragglers.

Moves · manual links avoided, re-raise rate

Grounded answers for the frontline

Answers scattered across four systems, written for engineers rather than the people asking. Retrieval inside the tool your team already works in, with citations and an explicit confidence score.

Moves · first-fix rate, handling time

Knowledge that maintains itself

The opposite problem: a corpus decaying in silence. Agents find the recurring issues no article covers, flag the drift between what resolvers did and what the article says, and draft the fix for an owner to approve.

Moves · time to publish, coverage gaps

Change & approval review

Volume far beyond review capacity, so most of it is sampled or waved through. Agents do the pre-work, score each record against your own control checklist, and hand reviewers a ranked agenda with the evidence attached.

Moves · change failure rate, reviewer hours

Blast-radius assessment

Work rated low-risk because nobody mapped what depends on it. Agents walk the dependency graph for affected services, criticality and schedule conflicts — and say plainly where the mapping is too thin to trust.

Moves · risk-rating accuracy, incidents caused

Closed-loop remediation

Alerts that a person triages, researches and fixes by hand with no verified loop back. Agents enrich, validate the target asset, execute through your existing automation once a human approves, then confirm the alert actually cleared.

Moves · mean time to resolve, manual triage

Document-heavy drafting

Formal artefacts assembled by reading hundreds of source documents. Parsing to structure the history, drafting to your template and precedent, a human reviewing before anything leaves the building.

Moves · cycle time per case, rework rate

Closure integrity

A free-text box where partial failures get recorded as clean successes. Agents draft the closure record from what actually happened and link the work to the incidents it caused — so the next decision has honest history behind it.

Moves · data completeness, accuracy of reported success

Intake quality at the source

A long form filled in badly, then weeks of chasing. Agents pre-fill from similar past requests, pull fields out of attachments, and catch the gaps before submission rather than after.

Moves · clarification requests, SLA breaches

Coordination & chasing

Cyclical processes that stall on getting decisions out of people across email and chat. Agents identify the accountable owner, run the follow-up, and close the loop back to the system of record.

Moves · lead time per cycle, touchless rate

Evaluation harnesses

The part most teams skip. A golden dataset and a scoring suite — exact comparison where the output is structured, judged scoring where it's prose — so a model or prompt change becomes a measured decision.

Moves · regressions caught, release confidence

Not on this list? The test isn't the technique. It's whether the work happens at volume, in a system with real history, with someone accountable for a number it affects. Bring it and we'll tell you honestly.

Engagements

Three ways in

Which one you start with depends on two things: whether there is already work running in systems we can mine on day one, and whether an executive has committed to a specific, high-value use case. Most clients start narrow and widen.

Start from what you already run

You have workflows at volume in systems with real history, but no single flagship use case yet. We mine your own schema, volumes and audit trail and put the first agents into production quickly, because the evidence we need already exists.

First agents live in weeks, not quarters

Start from the use case that matters

An executive has named the outcome and will sponsor it, but the ground is greenfield. We build the data and evaluation foundation alongside the agent, against a target written down before sprint one.

One sponsored use case to production

Both at once

You have the running workflows and the sponsored outcome. Two tracks in parallel: quick operational wins that earn trust and fund the programme, and the strategic build that changes how the function works.

Strongest outcome · operational and strategic

The engagement

Four phases, every time

Whichever way you come in, the shape does not change. Qualification decides whether we engage at all; discovery sets up the build; the build ships in two-week sprints; and the last phase exists to prove the number and get out of the way.

PhaseLengthWhat happensDone when
Qualify 2–4 weeks Confirm the workflow, the sponsor and the metric. Decide which way in — or that we're the wrong firm for this. A named sponsor, a named metric, an agreed entry point.
Baseline 3–4 weeks Environment and access set up. Each KPI defined as a query against your production data and agreed in writing. Scope and architecture fixed. A signed one-page baseline and a Phase 1 scope with explicit exclusions.
Build 6–12 weeks Two-week sprints. A working agent in front of users early, behind human review. Evaluation suite grows with the build. In production, used by the real team, measured against the baseline.
Prove & hand over ~4 weeks Monitored in production against the baseline. Runbooks written, your engineers running it with us watching. An agreed value number and a team that no longer needs us.

Method

Work backwards from the outcome

The agent is the last design decision, not the first. This is the discipline that separates a number from a demo, and we apply it to every engagement without exception.

  1. Start from a pain somebody can price

    Chosen because a sponsor can name the problem and what it costs — not because the technology is interesting. "It would be useful if…" is not a starting point.

  2. Find a metric you actually control

    If the agent works perfectly, does this number move directly? A KPI that needs three teams outside the scope to cooperate is not a target, it's a hope.

  3. Write the outcome sentence first

    One sentence stating the target. The capability list falls out of it. If the capability list came first, the scope is already wrong.

  4. Build the baseline before the agent

    Two weeks of your own data beats six months of industry benchmarks. Write the query before the prompt, and get the number agreed in writing while nobody yet has a reason to prefer a different one.

  5. Prove the value exceeds the cost

    Productivity value, minus running cost at target volume, minus what it takes to build and keep it alive. If that isn't comfortably positive, we rescope rather than build and hope.

We will tell you when the arithmetic says no. Finding that out in week one is the cheapest good news available; finding it out after launch, in front of a steering committee, is the expensive version of the same discovery.

Delivery

Production-grade beats demo-quality

Three things run in parallel through every build, because a working system that nobody adopts and a popular system that moves no number both count as failures.

The system

A production-grade build: monitoring, cost controls, empty-result handling, and a validation gate after every significant step.

The number

Continuous measurement against the agreed baseline, netting out overlaps so two levers never claim the same saved hour.

The adoption

Enablement for the people whose work changes, and runbooks for the team who will own it after we go.

Autonomy is earned, never assumed

Every agent is classified by the cost of being wrong, and that classification sets how much it is allowed to do. Everything ships at the first tier, whatever the demo looked like.

TierWhat the agent doesApplies to
RecommendSurfaces a recommendation and its evidence. A person reviews and executes every action.Everything, at go-live.
Act with approvalExecutes, but stops for human approval before anything irreversible.Agents that change records or start fulfilment.
Act aloneRuns unattended.Low-stakes agents only, after a formal review against pre-agreed accuracy benchmarks.

No agent of ours blocks, rejects or modifies a record of consequence without a human in the loop. Moving up a tier needs evidence from production and your sponsor's sign-off, not our enthusiasm.

The retrieval layer comes first

Most disappointing agents are retrieval failures wearing a model's clothes. We build the grounding layer before the agent, and we build it narrow.

Pointing a model at your entire history sounds thorough and behaves badly: it bloats context, it costs more, it is slower, and when somebody asks why the agent said that, "the embeddings returned these" is not an answer you can defend. We curate instead — a governed set of sources worth retrieving from, graded by how much weight each deserves, with provenance attached. Curation is expressed as rules and patterns, never record by record, because hand-tagging does not survive contact with six figures of records.

What you get, and what you don't

  • The working system, in production, on real work
  • The evaluation suite and golden dataset behind it
  • Dashboards measuring against the agreed baseline
  • Architecture notes and the decisions behind them
  • Runbooks, a path-to-production guide, and knowledge transfer
  • Ongoing support or managed service
  • Enterprise-scale load testing
  • Platform administration and upgrades
  • Organisation-wide training and change management
  • Security, privacy and compliance certification

The right-hand column is deliberate, not a gap. Those are real needs with real owners; pretending a build team covers them is how programmes end up with nobody accountable for any of it. We name them at qualification so they are somebody's job before go-live, not a surprise after.

What goes wrong

The failures we design against

We have seen each of these kill a programme that was technically fine. Naming them early is cheaper than discovering them late.

FailureHow it shows up
The vanity metricA KPI that looks commanding in the board pack and isn't actually moved by the agent.
The unverifiable baseline"The industry average is thirty percent." If it wasn't measured in your system, it isn't a baseline.
Cost blind spotsRunning cost modelled at pilot volume. Production volume turns a positive case negative.
Scope drift to the demoFeatures that present well in a review and move no number. Re-anchoring to the target is a sprint ritual.
Launch and leaveNobody reports the net value monthly, so the gains drift invisibly and the next budget cycle has no case.
Double-counted savingsThe same saved hour claimed under two initiatives, inflating a total that later collapses under scrutiny.

Fit

Who this is for

  • You have pilots that impressed people and changed nothing
  • The work runs at volume in a system with real history
  • An executive owns a number they want moved this year
  • Your engineers want to learn this, not outsource it forever
  • Someone internally can grant real systems access
  • You want a strategy deck with no build attached
  • You want staff augmentation priced by the seat
  • The goal is an announcement rather than an outcome
  • The target metric belongs to a team outside the scope
  • Access to real data is six months of paperwork away

About

Small on purpose

Applied AI FDE is a specialist practice, not an agency. The people who scope the work are the people who build it, and we take few enough engagements that this stays true. We would rather turn down a poor fit than staff it.

To fill in: your name, your background in a line or two, and why enterprise AI delivery specifically. This is the section buyers read hardest, and the one thing that can't be drafted for you.

Contact

Tell us what isn't shipping

A short description of the workflow and what's blocking it is enough to start. If we're not the right fit we'll say so, and point you somewhere better.